PORTFOLIO

Project Overview

Healthcare / Critical Infrastructure

Rock Building Services Group were tasked with replacing legacy data centre air conditioning systems serving Oxfordshire hospitals. Due to the critical nature of the facility, all works were carried out while maintaining full operational continuity of hospital data systems.

A black exclamation mark centered inside a black triangle outline on a white background.

Project Challenges

Any disruption would have had a significant impact on hospital operations, requiring absolute reliability, precise planning, and continuous site presence.

A simple black outline icon of a glowing light bulb.

Our Solution

We implemented a phased changeover strategy supported by 24-hour site attendance, ensuring systems remained operational throughout the upgrade process.

A black line icon of a clipboard with a document on it and a pencil resting on top, suggesting writing or taking notes.

Full Scope of Works

  1. Replacement of legacy data centre cooling systems
  2. Phased installation to maintain live operation
  3. 24-hour site attendance
  4. Testing, commissioning and validation
A hand holding a star-shaped badge icon representing quality or achievement.

The Result

  1. Zero disruption to hospital data systems
  2. Improved resilience and cooling performance
  3. Delivered on time and under budget